Every device developed under design controls carries a risk file. It is the manufacturer's own written answer to one question: what can go wrong with this device, and what did we do about it?
This guide explains how a risk file is put together under ISO 14971, how to read its tables, and how to tell whether the failure in front of you was foreseen, controlled, and watched after the device reached the market. It ends with the questions an engineering reviewer asks of every risk file.
Who this guide is for
- Legal counsel who must decide whether a hazard was known and what the manufacturer did about it.
- Manufacturers — engineering and quality teams who maintain a risk file or prepare it for review.
- Hospitals — risk managers and clinical engineering who evaluate a supplier's risk documentation.
This guide is general technical information. It is not legal advice. ISO 14971:2019 is the current edition; files written under ISO 14971:2007 or EN ISO 14971:2012 use slightly different terms. Read each file against the edition it cites.
01What a risk file is
ISO 14971 is the standard for risk management of medical devices. FDA recognizes it, and the Quality Management System Regulation requires risk management throughout design and production, by way of ISO 13485. The standard does not say how safe a device must be. It says how a manufacturer must decide that, write the decision down, and keep it current.
The output is the risk management file. It is not one document but a set: a plan, an analysis, the controls, their verification, an evaluation of what risk remains, and a record of what the field has taught since. A reviewer reads it in that order.
What the process will cover, who does it, and the criteria for calling a risk acceptable. The criteria are set here, by the manufacturer, before the analysis.
Intended use and foreseeable misuse; the hazards; the sequences of events that lead from hazard to harm; and for each one an estimate of probability and severity.
For each risk that needs reducing: the measure chosen, in the order the standard requires, and the evidence that the measure works.
What risk remains after the controls, judged against the plan's criteria, and the overall benefit-risk conclusion.
Production and post-production information, reviewed against the file, with the file revised when the field says something new.
A risk file written once and never revised is a file that stopped describing the device the day it shipped.
The forward chain runs from the plan to the residual-risk conclusion. Clause 10 closes the loop: what production and the field report must go back into the analysis. A file is current only if that arrow has been followed.
02Reading the tables
Most of a risk file is tables. Each row is one path from a hazard to a harm, with numbers attached. The steps below are the order in which to read a row, and the questions to ask at each column.
Find the hazard, the sequence, and the harm
A row should name three things separately: the hazard (a source of harm, such as stored energy, a hot surface, an incorrect output), the sequence of events that leads from the hazard to the patient, and the harm itself. Rows that name only a component failure ("sensor fails") without the sequence and the harm have not finished the analysis.
Look for the row that matches the event in question. If there is none, the hazard was not foreseen; if there is one, the rest of the row tells you what was done about it.
Read the estimates, then ask where they came from
Each row carries a probability and a severity, usually as scores. The scores are the manufacturer's estimates, and the standard requires them to be based on something: field data, test data, published rates, or expert judgment, stated as such.
A probability of "remote" with no data behind it is an assumption. An analysis in which every row lands just inside the acceptable region deserves a second look at how the scores were chosen.
Check the order of the controls
ISO 14971 sets the order in which risk-control options must be considered: first a design that removes or reduces the hazard, then a protective measure in the device or its production, and only then information for safety, such as a warning or training. The file should show that the earlier options were considered before a later one was chosen.
A hazard controlled by a warning alone is the lowest form of control the standard allows. The question is whether a design or protective option was available and why it was not used. The answer, if there is one, is in the option analysis.
Look for the verification of each control
A control is a claim until it is verified. The file should point, for each control, to the test or the design evidence that shows it works, and should consider whether the control itself introduced a new hazard. "Control: alarm" is not verified by the existence of the alarm; it is verified by a test that the alarm sounds in the conditions the row describes.
A failure mode and effects analysis (FMEA) is one input to a risk analysis, not the whole of it. An FMEA starts from component failures and works outward; it misses hazards that arise with no failure at all, such as a foreseeable misuse or a correct output used in the wrong situation. A file that consists only of FMEA tables has covered half the question.
03After the device ships
Clause 10 is the part of the standard that connects the risk file to the rest of the manufacturer's record. The manufacturer must collect information from production and from the field, complaints, service, adverse-event reports, and the literature, and review it against the file. When the information shows a hazard not foreseen, a risk estimate that was wrong, or a control that does not work in the field, the analysis must be reopened and the file revised.
This is the arrow on the left of the figure, and it is the one most often missing. The risk file was written to get the device released. The complaint system was built to handle complaints. Often nobody owns the link between them, and the file keeps the estimates of the day of release while the complaint database fills.
Guide 13 (complaints, MDRs and CAPA) and guide 15 (the timeline). A risk file dated before the first complaints, placed on the timeline next to those complaints, is the clearest picture of this gap.
04Where a weak file shows
These are the patterns an engineering reviewer looks for. Each is a question for the file, and a well-kept file answers it.
Estimates without data
Probability scores with no source, or the same score on every row. Ask for the data or the rationale the plan requires.
Severity rated down
A harm scored as "minor" that the complaint file describes as an injury. Compare the harm in the row with the harm in the field.
Warnings as the control
Rows where information for safety is the only control, with no option analysis of design or protective measures.
Acceptable by assertion
Rows marked acceptable with no criteria in the plan, or criteria changed after the analysis so the rows fit.
Controls not verified
Controls listed without a reference to the test or evidence that shows they work, or verified only in the lab.
No revision after the field
A file whose last revision predates the complaints, the MDRs, or the recall. The clause 10 arrow was not followed.
The event is not in the file
No row matches what happened. Either the hazard was not foreseen, or it was removed between revisions. Ask for every revision.
| Hazard | Sequence / harm | P | S | Control |
|---|---|---|---|---|
| Under-delivery of therapy | Line kinks; pressure rises; occlusion alarm delayed; dose not delivered; delayed therapy | 2 | 3 | Alarm; IFU warning |
Probability 2 of 5, severity 3 of 5, product inside the acceptable region. Control: the occlusion alarm, plus a warning in the instructions. Verified: "alarm function tested". Status: acceptable.
Where does probability 2 come from, and does the complaint file agree? Why is the harm "delayed therapy" when the drug in the intended use is one where a delay is an injury? The alarm is a protective measure; was a design option, such as a pressure limit that stops the pump, considered and rejected, and why? "Alarm function tested": under which occlusion pressure, which line, which flow rate, and how long did the alarm take? Was the row revised after the complaints about late alarms?
Each question points to a document: the plan's criteria, the complaint trend, the option analysis, the verification protocol, the revision history. None of them decides the case alone. Together they show whether the row was an analysis or a form.
✓Reading a risk file
- Plan obtained; acceptability criteria read before the tables
- Edition of ISO 14971 cited; terms read against that edition
- Every revision of the file obtained, with dates
- Row found that matches the event, or its absence noted
- Hazard, sequence, and harm named separately in that row
- Source of each probability and severity estimate identified
- Order of controls checked: design, protection, information
- Verification evidence found for each control in the row
- New hazards from the controls considered
- Clause 10 review found: field data compared with the file
- File revision dates placed on the timeline next to complaints and MDRs
- Questions written as questions, with the document each one points to
§Sources and further reading
A–ZTerms used in this guide
- Hazard
- A potential source of harm: an energy, a substance, a sharp edge, a software fault.
- Hazardous situation
- A circumstance in which people, property, or the environment are exposed to one or more hazards.
- Harm
- Injury or damage to the health of people, or damage to property or the environment.
- Risk
- The combination of the probability of occurrence of harm and the severity of that harm.
- Risk control
- The measures taken to reduce a risk: inherently safe design first, protective measures second, information for safety last.
- Residual risk
- The risk that remains after risk control measures have been taken, judged against the criteria in the plan.
- Risk management file
- The set of records produced by the risk management process, from the plan to the post-production review.
- Post-production information
- Complaints, service data, field actions, and literature that must be reviewed against the risk file after the device is on the market.
